Edit timesheet entry from my global timesheet
Currently if I need to update a timesheet entry I can't do this from the main (= no project selected) page.
I need to switch to the specific project -> move to timesheet -> find the entry -> edit it.
It would be great to be able to edit timesheet entries straight from the "global" timesheet.
It should be "easy" for you guys, and a huge timesaver for me.
Thanks in advance.