Changes made to Lead , especially Lead status should be tracked with the time stamp included.

Changes made to Lead , especially Lead status should be tracked with the time stamp included.

Hi,

Is there a way to see the complete history of changes made to the Lead? For instance , the Lead status which was "attempted to contact" at 2:00 changed to "contacted" at 2:50 .