Can others please provide what works for their set-up between Google Calendar, Calendly, and Zoho CRM Calendar? Thank you in advance.
(We don't use Zoho Calendar. Yes, their names are confusing! We use the calendar in Zoho CRM Calendar.)
Our Current Set-up:
How are people overcoming these double email and GMT rescheduling issues?
Do you keep bi-directional sync between Google Calendar and Zoho Calendar? How do you overcome meetings automatically rescheduling themselves?
Thank you.
Sam
Here is a summary of why we turned off bi-directional sync:
The original issue was caused by timezone mismatch during bidirectional sync between:
-
Google Calendar
-
Zoho CRM (calendar module)
What happened
-
One system stored the event in UTC
-
The other interpreted it as local time (Central)
-
During sync, it re-applied the timezone offset
Result
-
Meetings shifted by –5 hours (–5 GMT)
Why it only happen with bidirectional sync
-
Each system kept “correcting” the time on every sync pass
-
Created a loop → time kept getting offset incorrectly