Getting all time for a month by project/tasklist/task

Getting all time for a month by project/tasklist/task

Hi, 

Using the dotnet wrappers I can obtain a totals per user for time spent on a project.  I cannot break this down to specific tasks the user has logged time against.  How is this possible?

Eg. If I do the following:


Dim timelogs As zohoprojects.model.Timelogs = TIMEAPI.GetTimeLogs(proj_id, logParams)


I only get the timelogs.grandtotal populated.  The timelogs.tasklogs are never populated.  Also the timelogs.timelog.date is always empty/null.  

Thanks

Duncan

      • Topic Participants

      • Dunc