Eliminating Manual Consolidation: Automating Currency Field Sync from Task to Project

Eliminating Manual Consolidation: Automating Currency Field Sync from Task to Project

Hello Everyone,

A Custom function is a user-written set of code to achieve a specific requirement. Set the required conditions needed as when to trigger using the Workflow rules (be it Tasks / Project) and associate the custom function to it.

Requirement:

One of our customers has created four custom currency fields at the Task level and a related set of four custom currency fields at the Project level. Their requirement is to roll up the cumulative values from the Task-level fields and automatically sync them to the corresponding Project-level fields. This requirement was successfully achieved using Custom Function along with Workflow rules.

Quote
This approach ensures that project level data stays accurate and up to date without the need for manual consolidation.
 
Custom function code:
 
projectsv3APIEndPoint = "https://projectsapi.zoho.com/api/v3";
totalMilestoneRev = 0;
totalActualRev = 0;
totalMilestoneGP1 = 0;
totalActualGP1 = 0;
indexValue = 1;
rangeValue = 100;
loop = {1,2,3};
// This loop fetches up to 300 tasks. Increase the count as needed, e.g., loop = {1,2,3,4,5}; to fetch 500 tasks.
for each  i in loop
{
taskParameter = Map();
taskParameter.put("index",indexValue);
taskParameter.put("range",rangeValue);
// info taskParameter;
taskResponse = zoho.projects.getRecords(portalId,projectId,"tasks",taskParameter,0,"XXXXX");
//  info taskResponse;
if(taskResponse.containKey("tasks"))
{
for each  task in taskResponse.get("tasks")
{
if(task.containsKey("custom_fields"))
{
customFields = task.get("custom_fields");
for each  customField in customFields
{
if(customField.get("label_name").equalsIgnoreCase("Milestone Rev"))
{
milestoneRev = customField.get("value");
if(milestoneRev.equalsIgnoreCase("-"))
{
milestoneRev = 0;
}
totalMilestoneRev = totalMilestoneRev + milestoneRev.remove(",").toDecimal();
}
if(customField.get("label_name").equalsIgnoreCase("Actual Rev"))
{
actualRev = customField.get("value");
if(actualRev.equalsIgnoreCase("-"))
{
actualRev = 0;
}
totalActualRev = totalActualRev + actualRev.remove(",").toDecimal();
}
if(customField.get("label_name").equalsIgnoreCase("Milestone GP1"))
{
milestoneGP1 = customField.get("value");
if(milestoneGP1.equalsIgnoreCase("-"))
{
milestoneGP1 = 0;
}
totalMilestoneGP1 = totalMilestoneGP1 + milestoneGP1.remove(",").toDecimal();
}
if(customField.get("label_name").equalsIgnoreCase("Actual GP1"))
{
actualGP1 = customField.get("value");
if(actualGP1.equalsIgnoreCase("-"))
{
actualGP1 = 0;
}
totalActualGP1 = totalActualGP1 + actualGP1.remove(",").toDecimal();
}
}
}
}
indexValue = indexValue + 100;
}
else
{
break;
}
}
/*Rollup to project*/
projectParams = Map();
projectParams.put("baseline_revenue",{"amount":totalMilestoneRev.round(2)});
projectParams.put("projects_cf_0002",{"amount":totalActualRev.round(2)});
projectParams.put("baseline_gp1",{"amount":totalMilestoneGP1.round(2)});
projectParams.put("actual_gp1",{"amount":totalActualGP1.round(2)});
info projectParams;
updateProject = invokeurl
[
url :projectsv3APIEndPoint + "/portal/" + portalId + "/projects/" + projectId
type :PATCH
parameters:projectParams.toString()
connection:"XXXXX"
];
info updateProject;
return "success";
 
Make sure to replace XXXXX with Zoho Projects connection link name along with scopes: ZohoProjects.projects.ALL, ZohoProjects.Tasks.ALL and the custom fields based on your requirement. Please find the screenshot of the list of parameters to be mapped for reference.
 
We hope you found this post useful. If you have any questions, feel free to share them in the comments below.

    • Sticky Posts

    • Accessibility Spotlight Series - 1

      Every user interacts with products differently, what feels intuitive to one may be challenging for another. Addressing this, accessibility is built into Zoho Project's design philosophy. This helps users navigate and perform actions with ease irrespective
    • Customize User Invites with Invitation Templates

      Invitation Templates help streamline the invitation process by allowing users to create customized email formats instead of sending a one-size-fits-all email. Different invitation templates can be created for portal users and client users to align with
    • Zoho Projects - Q3 Updates | 2025

      Hello Users, The final quarter of the year 2025 has begun, and we at Zoho Projects are all set with a plan. New targets to achieve and new milestones to reach, influenced by the lasting imprint of the past quarter. 2025's Q3 saw some new features and
    • Introducing Version-3 APIs - Explore New APIs & Enhancements

      Happy to announce the release of Version 3 (V3) APIs with an easy to use interface, new APIs, and more examples to help you understand and access the APIs better. V3 APIs can be accessed through our new link, where you can explore our complete documentation,
    • Schedule Exports for Regular Project Updates

      Tracking project data often means exporting data at regular intervals. Instead of manually exporting data every time, users can schedule exports for Phases, Tasks, and Tasks in Zoho Projects. These exports can be set to run once, daily, weekly, or monthly