Project Change Orders and Additions

Project Change Orders and Additions

We are in the process of migrating from QuickBooks Online to Zoho Books. We have Zoho One and like the ability to sync all of our data across everything. And I like that projects work in a way that's less dumb than QuickBooks. I'm trying to figure out something and hoped that you all could help.

We are basically an IT general contractor. Our projects are mostly fixed cost, so the fixed cost option in Zoho Books/Projects works great. The question is about invoicing above and beyond. Sometime the client changes the scope of work, and we charge for those as a change order. In Projects, it's basically an invoiced Issue/Bug.

Is there a simple way to add an item or charge to a project? Can a Sales Order, Expense, or Bill allow us to invoice for additional amounts? Or do we need to adjust the Fixed Cost (which would suck cause we need to do that in Projects)?

Thanks!


        • Recent Topics

        • Generate a Zoho Sign link

          From time to time I get a response "I never received your you e-document for electronic signature" is there a way to generate a Zoho Sign link to share.
        • Is it possible to create a word cloud chart in ZoHo Analystics?

          Hi there, I have a volume of transaction text that I would like to analyse using word cloud (or other approcah to detect and present word frequency in a dataset). For example, I have 50,000 records describing menu items in restaurants. I want to be able
        • How to Fix the Corrupted Outlook 2019 .pst file on Windows safely?

          There are multiple reasons to get corrupted PST files (due to a power failure, system crash, or forced shutdown) and several other reasons. If You are using this ScanePST.EXE Microsoft inbuilt recovery tool, it only supports the minor corruption issue
        • [Webinar] A recap of Zoho Writer in 2025

          Hi Zoho Writer users, We're excited to announce Zoho Writer's webinar for January 2026: A recap of Zoho Writer in 2025. This webinar will provide a recap of the features and enhancements we added in 2025 to enhance your productivity. Choose your preferred
        • How to drag row(s) or column(s)?

          Hi. Selecting a row or column and then dragging it to a new position does not seem to work. Am i missing something or this is just not possible in Zoho Sheet? Cheers, Jay
        • Building Toppings #5 - Creating and configuring custom service connections in Bigin Toppings

          Hello Biginners, Integrating Bigin with external applications extends its capabilities and enables customized functionalities. In our last post, we saw how to create a default service connection. Today, we'll see how to create a custom service connection
        • Optimising CRM-Projects workflows to manage requests, using Forms as an intermediary

          Is it possible to create a workflow between three apps with traceability between them all? We send information from Zoho CRM Deals over to Zoho Projects for project management and execution. We have used a lookup of sorts to create tasks in the past,
        • Marketing Tip #15: Rank better with keyword-rich URLs for product pages

          Your product page URL is a small detail that can make a surprisingly big difference. Clean, readable URLs help in two ways: They’re easier for customers to trust and remember (no one likes clicking a link that looks messy or random). They help search
        • Conditional fields when converting a Lead and creating a Deal

          Hi, On my Deal page I have a field which has a rule against it. Depending on the value entered, depends on which further fields are displayed. When I convert a Lead and select for a Deal to be created as well, all fields are shown, regardless of the value
        • ATE Session on Payment Gateways: Our experts are live now. Post your questions now!

          Hello everyone, Our experts are all excited to answer all your questions related to payment workflows. Please feel free to join this session and learn more about this topic. If you have a query at anytime, please post them here.
        • Upload data deleted all Zoho form data that we manage

          Good morning. Let me introduce myself, I'm Iky from Indonesia. I'm experiencing an error or problem using Zoho Forms. I manage Zoho Forms, but I previously encountered an error when I misclicked the delete button in the upload format. It apparently deleted
        • ZOHO FORMにURL表示ができない

          初心者です。 ZOHO FORM で宿泊者名簿を作っています。 ゲストが、URLをクリックするとStripeで支払いができるようにURLを表示をしたいのですが、 上手くできません。 やり方が分かる方、ぜひ教えてください。
        • Custom module - change from autonumber to name

          I fear I know the answer to this already, but thought I'd ask the question. I created a custom module and instead of having a name as being the primary field, I changed it to an auto-number. I didn't realise that all searches would only show this reference.
        • No Automatic Spacing on the Notebook App?

          When I'm adding to notes on the app, I have to add spaces between words myself, rather than it automatically doing it. All my other apps add spacing, so it must be something with Zoho. Is there a setting I need to change, or something else I can do so
        • Holidays - Cannot Enter Two Holidays on Same Day

          I have a fairly common setup, where part-time employees receive 1/2 day's pay on a holiday and full-time employees receive a full day's pay. Historically, I've been able to accommodate this by entering two separate holidays, one that covers full-time
        • Campaigns set up and execution assistance

          Hello Community, Can someone recommend a professional who can assist with the completion of my set up and deployment of Campaigns? Looking for a person or company that is not going to ask for big dollars up-front without a guarantee of performance to
        • Zobot with Plugs

          Hello, I am having a problem with Zobot using Plugs. Here is my current flow: When I run the flow, I should immediately see the messages from the initial cards (Send Message cards), then after running the plug, and finally, see the messages after the
        • Kaizen #223 - File Manager in CRM Widget Using ZRC Methods

          Hello, CRM Wizards! Here is what we are improving this week with Kaizen. we will explore the new ZRC (Zoho Request Client) introduced in Widget SDK v1.5, and learn how to use it to build a Related List Widget that integrates with Zoho WorkDrive. It helps
        • Remove Powered by Zoho at the footer

          Hi, I've read two past tickets regarding this but it seems that the instructions given are outdated. I assume the layout keeps on changing, which makes it frustrating for me to search high and low. Please let me know how exactly do I do this now? Th
        • No Need To Fix Something That Is Working

          Zoho Books is a great financial tool which helps businesses to become more efficient and productive with day-to-day operations. As such, every change, upgrade, improvement needs to be carefully thought before implemented in the software and I'm sure Zoho
        • Using email "importance" as workflow-criteria

          I'd like to set up a workflow that triggers if an incoming email has been flagged as "high importance" but I'm not seeing any way to do that. Hopefully I'm just missing something obvious...?
        • This domain is not allowed to add. Please contact support-as@zohocorp.com for further details

          I am trying to setup the free version of Zoho Mail. When I tried to add my domain, theselfreunion.com I got the error message that is the subject of this Topic. I've read your other community forum topics, and this is NOT a free domain. So what is the
        • What is Resolution Time in Business Hours

          HI, What is the formula used to find the total time spent by an agent on a particular ticket? How is Resolution Time in Business Hours calculated in Zohodesk? As we need to find out the time spent on the ticket's solution by an agent we seek your assistance
        • Check & Unchecked Task Segregation in Export

          It must have a feature to represent checked and unchecked tasks as [ ] and [✅] respectively when exporting it to Arratai or WhatsApp ; as Keep Notes by Google contains…
        • WorkDrive Download Issue

          My client has been sending me files via WorkDrive, which generally has worked fine. Recently files won't download at all. If you try and individually select and download a file, a popup will appear in the bottom right saying it's preparing and then it
        • Resolution Time Report

          From data to decisions: A deep dive into ticketing system reports What are time-based reports? Time-based reports are valuable tools that help us understand how well things are going by breaking down key metrics over specific periods. By tracking, measuring,
        • Add RTL (Right-to-Left) Text Direction Button in Zoho Cliq

          Greetings Zoho Team, We would like to request the addition of an RTL (Right-to-Left) text direction button in Zoho Cliq, similar to what is already available in other Zoho apps like Zoho Desk. Currently, while using Zoho Cliq with the English interface,
        • Enable Backgrounds and Video Filters for 1:1 Cliq Calls Across All Zoho Entry

          Hello Zoho Cliq Team, We hope you are doing well. We would like to request an enhancement related specifically to 1:1 video calls in Zoho Cliq. Current Behavior Zoho Cliq currently provides background and video filter options in the following scenarios:
        • Zoho Flow: Stripe a Zoho Marketing Automation

          Hola! Quiero hacer un flujo con Zoho Flow, para que cuando se haga un pago en Stripe, añada el lead en Zoho Marketing Automation. Lo he configurado, configurando el disparador como "Payment created" y mapeando el campo de Stripe "Receipt email address".
        • Need Customer Item Inward Module along with QC

          Need Customer Item Inward Module along with QC 1. Using Transfer Orders hit the item balance sheet 2. Items without inventory it becomes difficult for tracking purpose. 3. Custom Modules become tedious to capture multiple items, item subforms are not
        • LESS_THAN_MIN_OCCURANCE - code 2945

          Hi I'm trying to post a customer record to creator API and getting this error message. So cryptic. Can someone please help? Thanks Varun
        • Invalid tax authority ID.

          How do I correct this ?
        • Zoho email

          I need a list of email addresses of all contacts on my zoho
        • Shift-Centric View for Assigning and Managing Shifts in Zoho People

          Hello Zoho People Product Team, Greetings and hope you are doing well. This feature request is related to Zoho People - please don't move it to zoho one! We would like to submit a feature request regarding the shift assignment and management view in Zoho
        • cant upload images in signature- urgent help needed. ta!

          HI, I have been trying to insert the company logo in the signature. i have tried it several times since yesterday, the longest I waited was 1 hour and 12 minutes for the pop up window to upload a 180 KB .jpg file. what am i doing wrong.. an urgent reply
        • Add Ticket button in Home view

          When I go to the My Tickets or the Knowledge Base view in our Help Centre, the Add Ticket button is available, but not in the Home view. I would really like for it to be displayed in the Home view as well. Is this possible? Thanks.
        • Problem using Zoho Desk API

          Goodmorning, I am trying to use the Zoho Desk API to create a dashboard in Grafana, but I am having a problem. Following the instructions in the API documentation, I created the API Console application (server-based application). Then I created the string
        • Add zoho calendar to google calendar

          Hi I keep seeing instructions on how to sync Zoho CRM calendar with google calendar but no instructions on how to view Zoho calendar in my google calendar.
        • How to print a label from zoho creator app?

          Hello, I would like to print a label from zoho creator app record similar to attached one. Size 74mm x 102mm. I tried record template. It leaves plenty of space around the content and also I couldn't set the height of the page. So it is not printing properly. Could someone please direct me to right direction for this requirement?
        • City field suggestion in Zoho Books

          Hi team, We are using Customers module in Zoho Books. In the Address section, we want to understand whether the City field can show suggestions while typing using any API or built-in feature. For example, if a user types “Mum”, can the system suggest
        • Next Page